Each driving procedure must be carried out, subject to each type of test of each test execution. The equalization cycle test shows accurate analysis especially data performance. Therefore, it is the correct diagnosis of the results of these tests. Since a special situation may affect its assessment, it will not work well. This means a reduction in incorrect test results, which is negligible. This is why it is important to ensure that the expected behavior of these tests is fulfilled in terms of preparation.
How to test?
You should test that the temperature control line is in the correct position. Otherwise, you need to fix the vertical balance switch. Impedance probes that match the probe before using its impedance should be part of their conversion. There is a variable capacitor at one end of the probe near the oscilloscope. A few of the reviews may also have the ability to change that aspect of the review. It is used to adjust the impedance matching of the oscilloscope probe. If it fits, the measured waveform will be distorted. The waveform of the heat cycle test determines whether you are doing the right amount of damage.
How to adjust the temperature of the thermal cycle laboratory?
The temperature in the test room temperature cycling refers to the process in which the room is gradually reduced and stabilized at the specified temperature after the initial operation when the room is higher than the temperature of 3 ° C.
The temperature adjustment corresponds to a constant ± 3°C or determines the range of the temperature cycling test chamber from the temperature of the test stage. For example, the temperature range 0-100 °C should not exceed 2 °C. An excess of 100 ℃ or more shall not exceed 2 percent of the inspection level. The control tool for this application is easy to see the correctness of the adjustment control. It has the functions of automation, program calculation, and the storage of parameters of historical data and parts.
Once the temperature exceeds the normal range, it is important to contact the manufacturer for immediate correction. Otherwise, you can ask a third-party metrology company to make the change. When the temperature is too high, the equipment and the manufacturer’s production process of this temperature system affect the laboratory which is not suitable. So we remind customers that they shouldn’t look for unlimited cheap devices when buying equipment.
Are you stuck on the wrong water system error while running a heat cycle lab?
Now, let me discuss the common problems and solutions of your equipment. We often divide water system errors due to water damage and water scarcity. First, we look at water leaks. Water leaks are mainly caused by water ball holes and water leaks in the thermal cycling test chamber.
The water ball pit is under the water ball bed. Under these conditions, it is expected that the soil is not good, causing the water in the side to flow in the water ball. It requires the adjustment of the horizontal plane of the ground. This situation should be considered in the water supply of the humidity laboratory. There is a water inlet valve installed in the water source and water tank Can be large. You can try to resolve your own valve. If you still find that the water line is leaking, it may be due to water in the water tank and water line. The correction of this deficiency can be solved directly with the associated joint function.
Fix Low Temperature Interruption of the Temperature Cycling Monitor
A variety of factors can cause it to fall in and interfere with the evaluation so that it is not completed properly. First, find out if the computer’s cooling system can start during the race. It shows that the power source is stable. There was no problem with the electricity, but the various systems started to diagnose the system and continued to check the refrigeration system.
Two different types of compressors should be investigated and the pressure values of this reduced temperature compressor should be checked. If you find a fault, it means that the damping of the cooling system is not enough. It will be on hand to test the room temperature of the exhaust and the water line of the R23 compressor of the same distributor. If the exhaust tube temperature is not high, the intake tube is not low; this is a significant indication of the lack of refrigerant. In the case of severe cooling, the 2 units work at the same time and heat to maintain the first part of the condition. If these two groups work together, this shows that the heat has stopped.
Conclusion
In the equipment test, many people still take it because of the limited equipment, and the purpose and price is the price to be paid. On the face of it, this argument is correct, but underneath it is not. Test equipment and other products have significant differences, especially testing, testing equipment and test equipment used for testing. The accuracy of the test information is related to the caliber of the equipment. Therefore, the accuracy of the equipment and the stability of their test results are the main types of gear performance tests. Testing equipment such as the performance of a cycling test facility does not depend on the number of test items. It is an investigation of discovery and stability of the research results.